ST JAMES GOLD CORP’s OPERATOR SECURES DRILL CONTRACTOR FOR UP TO 13,000 METRES OF DRILLING AT THE FLORIN GOLD PROJECT IN THE YUKON TERRITORY, CANADA

July 12, 2021